The Kindia Tunnel is located in the low and medium mountain areas of the southern Fouta Djallon plateau in Guinea. It is a key element of the railway linking Morebaya Port and the Simandou mining area. The tunnel has a total length of 11.62 km and a design operating speed of 120 km/h, in a single-tube, double-track configuration. The tunnel site is dominated by Grade III and IV surrounding rock, with steep terrain, numerous fault zones and complex geological conditions, making construction highly challenging.
Chinese standards, Chinese technology and Chinese equipment are used throughout the line, and once completed it will become the longest tunnel in Guinea. CEEG supplied ZGS-Z-1500/10 series American-standard conventional substation products for the project, strongly supporting its high-quality execution.