Kenya Lamu Port Berths 1-3 Project
Africa · Kenya
The project is located in the Loango District of Kouilou Province, Republic of the Congo, with a designed capacity of 2 million tonnes of potassium chloride per year and a construction investment of approximately RMB 3.5 billion. It is expected to be completed and put into operation by the end of 2026. The Phase I project, with an annual capacity of 2 million tonnes of potassium chloride, requires a production power load of about 90MW. To meet the project's production power demand, one 220kV outgoing line bay, an approximately 28.5km 220kV transmission line and a supporting 220kV/35kV substation are planned. Facing fierce market competition, CEEG won the unanimous recognition of the owner and the bid evaluation committee with its strong technical strength, extensive overseas project experience and sound reputation and qualifications, and was successfully awarded the contract for SZ18-20000/30/10.5. Once in operation, the project will ease local power supply pressure, greatly improve power quality, and provide strong support for the daily lives of local residents and for economic development.